Welcome to our portfolio page, take a look at the different design choices you could have! Get inspired!
There’s no better way to tell you about what we do and how we do it than by looking at some of our recent work. If you’re happy, we’re happy, and we love getting feedback in order to improve our service. Have a look at some of our work below, and contact us to submit your own if we have missed your bathroom out....sorry :)
Stunning Ensuite
We completed this amazing en-suite in Newbury Autumn 2022
We completed this bathroom October 2021 in West End!
BEFORE
We installed a low profile shower tray along with building a bespoke alcove as a feature for the bathroom!
AFTER
This bathroom was leaking and had a shower curtain taped to the back wall in order to contain the water in the bath!
We moved the door & frame 200mm to the right in order to maximise bathroom space so we could fit a shower bath in the space!
BEFORE
We installed a slate shower tray and retiled the back wall of this existing en-suite!
We completed this kitchen in Portsmouth in the summer of 2021!
This large family bathroom was completed in North Baddesley September 2021. Stunning!
We built this bathroom from scratch into a large bedroom! This end result looks fantastic!
We completed this bathroom in Hedge end Summer 2021
BEFORE
We installed a sliding door in place of the original door to maximise the bathroom space. We also installed a TV in the bathroom!!!
AFTER
We completed this bathroom in Hedge end Summer 2021
BEFORE
Simply Stunning!
AFTER
We completed this ensuite bathroom in December 2020.
BEFORE
The feature wall & the design of the shower screen work very well together.
AFTER
The other end of the ensuite.
BEFORE
We replaced the bath with the His & hers Vanity Unit and moved the toilet to the centre of the room creating space for the large walk in shower above.
AFTER
We completed this master bathroom in September 2020
BEFORE
We replaced the bath with a low profile shower tray. We managed to conceal the waste under the floor in order to create more space in the bathroom.
AFTER
We completed this master bathroom in October 2020
BEFORE
We finished this bathroom in 5 days! We kept everything in the same place which saved time.
AFTER
We completed this master bathroom in January 2021
BEFORE
We removed the bath completely, installed a MIRA electric shower with a shower enclosure!
AFTER
BASINGSTOKE KITCHEN INSTALLATION
We completed this kitchen ahead of schedule and to the highest quality. We completed this in October 2019
BEFORE / AFTER KITCHEN RENOVATION
Full renovation of a kitchen in Gosport 2019
BEFORE / AFTER BATHROOM RENOVATION
We had to knock down an entire brick wall that originally separated the toilet and bathroom from one another. It created so much more space within the family bathroom. Completed September 2018.
COMPACT DOWNSTAIRS W/C
We utilised every inch of space in this small downstairs W/C renovation. This took us just under 2 days to complete.
A PROPERTY WE BUILT FROM THE GROUND UP IN BASINGSTOKE.
Even though we specialise in renovations, plumbing & boilers we did get an exciting opportunity to build a property from the ground up in Basingstoke over 2019.
EN-SUITE RENOVATION
Despite some unforeseen difficulties, this particular project was completed on time and within budget. We like to install LED compatible mirrors upon request as we feel they set the room off.